Contractor's All Risk


Scope Of Cover
Provides protection against loss or damage in respect of the contract works at contract site and third party claims arising in connection with the construction of a project.

The Insured Parties
The Principal, Contractor and all Sub-Contractors, Operators, Suppliers, Consultants, Financing Parties who are engaged in the contract/project. Note: Third party means any person other than those related to or working for the contract/project.



   
Property Insured
All the works to be performed under the contract whether they are preparatory, provisional or final together will all materials and equipments constituting them.

In addition, the cover may include Third Party Liability, Construction Plant and Equipment, Construction Material, Clearance & Removal Of Debris, Professional Fees and Surrounding Property, Escalation,Maintenance Cover.

Sum Insured
The sum Insured must be similar with the contract value represents all the investment needed to carrying out the contract/project. Any increase in the contract sum must be notified immediately to the Company in order to avoid under-insurance and additional premium will be charged.


Information required for Quotation
Letter of Award (compulsory)
Breakdown of sum insured/Contract value
Scope of Works
Layout and/or Location Plans
Time schedule/Bar Chart
Limit of third party liability
Third party surrounding Properties and distance
 

Exclusions
Usual exclusions on nuclear and war damage.
Consequential Loss on material damage.
Cessation of work whether total or partial.
Direct faulty design.
The cost of replacement or rectification of the Property insured rendered necessary by defective material and workmanship but this insurance shall cover the cost of making good any damage to other Property Insured under this policy resulting from such defective material and workmanship.

Loss or Damage to:-
Loss of or damage to any items of plant machinery or equipment directly due to it's own breakdown, failure, breakage, derangement or explosion.
Loss of or damage to any deeds, bonds, account bill of exchange, promissory notes, cash, bank notes, cheques, security for money or stamp.
Loss or damage due to normal wear and tear, corrosion, rust, aesthetics defect, gradual deterioration or deterioration due the atmospheric and/ climate conditions.
Loss of property either by disappearance or by shortage if such disappearance or shortage is only revealed when an inventory is made and the loss cannot be traced to any event.
In respect of which a Certificate of Completion has been issued or which has been completed and handed over to or taken into used by the Principals or which arise after practical completion unless such loss and such loss and damage be occasioned during the Maintenance Period specified in the schedule or by the contractor in the course of any operations carried out by him for the purposes of complying with the obligations under the maintenance provisions of the contract.


Build your own (small) home 构建自己的(小)的家

What A Bad Day














































Environmental and Housekeeping

Construction Accident

Crane Falls Killing One (Bellevue, Washington)

Dangers of unqualified contractors (Before)

Dangers of unqualified contractors (After)

Scaffold Collapse!!!


Skype : simpoon ; simpoon3

Erection All Risk

Scope of Cover
Provides protection against all the risks involved in the erection of machinery, plant and steel structures of any kind as well as third party claims arising in connection with the installation works of the project. The coverage commences from the unloading of items insured to erection work and until test operation has been completed excluding used/second-hand machines where cover ceases upon commencement of testing/commissioning.

Insured
The Principal, Contractor and manufacturer/supplier of the machinery or plant if they carry out the erection work.
Note: Third party means any person other than those related to or working for the contract/project.


Property Insured
All kinds of erection and testing on individual machine, industrial machinery, industrial plants, steel works and/or structure.

In addition, the cover may include Third Party Liability, Civil Engineering Works, Equipment for Erection, Clearance & Removal of Debris, Professional Fees and Surrounding Property, Escalation, Maintenance Cover,Contractor's Plant and Machinery.

Sum Insured
The sum insured similar with the value of the machinery or plant to be erected, and should includes freight, customs duties, dues and erection costs. The Insured undertakes to inform the Company on the increase of sum insured and an additional premium will be charged.

Premium
The premium is calculated at a rate applied to the sum insured and is charged for the full period of the contract and inclusive of testing period. Should there be any extension on period of insurance an additional premium calculated on pro-rata basis is chargeable.
Premium on equipment for erection is charged on an annual basis.

Information required for Quotation
Letter of Award (compulsory)

Breakdown of sum insured
Scope of Works
List of machines with respective value
Layout Plans
Time schedule/Bar Chart
Limit of third party liability
third party surrounding property and distance
machinery origin and supplier


Referred Risks
Energy
Heavy Industries
High Technology Industries


Declined Risk
Off-shore
 

Workmen Compensation Insurance (Project)

Introduction
This insurance is designed to cover death or injuries suffered by employees arising out of their employment.It also indemnifies the Employer (Insured) if sued by employees for negligence, if this is extended.

Coverage is not compulsory in respect of worker, subscribing to the SOCSO scheme although it may be taken up by the Employer (insured) if desired. Principal Compensations Available under Workmen's Compensation Ordinance

Sum Insured
i) Based on the estimated annual earnings of the employees.
ii)Contract work, to take at least 10% of the contract value as wages for all workers


Death And Nature of Disability
Lump Sum Compensation(whichever is less)

1. Death 60 month earnings or RM 18,000.00
2. If the deceased workman has no dependents Funeral expenses or     
    RM1,000.00
3. Permanent total disablement adult who has completed his/her 18th 
    year of age. 60 month earnings or RM 23,000.00
4. Other adults 84 months earning or RM23,000.00
5. Minor 108 months earnings or RM23,000.00
6. Death following a period of total or partial temporary disablement
    Total of all half-monthly payments under (7) and lump sum payable for        
    such death should not exceed RM23,000.00
7. Half-monthly payments for temporary disablement RM165.00 or one 
    third of monthly earnings. 


Rating
i) Premium rate is computed on the estimated anual salary of each employee
ii)The Workmen's Compensation Tariff Rating table (as attached) currently 
serves as a guide 
iii)Agents are advised to refer to the company for guidance where lower rates  are accepted to secure risks. 


Common Law Extension in a Workmen's Compensation Policy.
A loading of 10% to 25% if the Comon Law is extended in a Workmen's Compensations Policy.
If the job is hazardous, the Common law limit should be restricted
to a lower limit e.g. RM250,000.00

Underwriting Consideration
i)   The proposal form must be properly completed giving detail description of the 
work done by various employees 
ii)  Previous claim experience
iii) To ensure that they are no moral hazards involved.
    e.g. : Employers with unsafe or hazardous place and system of work                 
             Safety

Refer/Decline Risk
Refer Risks

i. Cleaning / painting works on outer buildings exceeding 30 ft. in height
ii. Divers
iii. Timber loggers
iv. Acid and gas works
v. Service and maintenance work on board vessels


Decline Risks
i. Aircraft crews
ii. Asbestos related risks
iii. All claims and losses resulting from work carried out to produce latex based products
iv. Construction and maintenance of dams
v. Contractors engaged exclusively in wrecking and demolition
vi. Fire brigades
vii. Manufacture and/or production, storage, filing, breaking down transport of a. fireworks, fuse(s), cartridges, ammunition, powder, nitroglycerine or any explosives
b. gases and/or air under pressure in containers
c. Butane, Methane, Propane, and other liquefied gases
d. toxic substances and toxic waste (It is understood and agreed, however,that the storage and transport of any of the substances above mentioned which is merely incidental to the operations and/or trade of the company’s insured not otherwise excluded, is hereby covered)
viii. Offshore rigs
ix. Petroleum and gas exploration, production, drilling, producing, refining and distributing (other than general distributors and petrol stations). This exclusion also applied to general maintenance / repairs carried out by general contractors and incidental contracts directly related to (Petroleum and gas explosion)
x. Quarries, if explosives are used, unless merely incidental to the operations and/or trade of the company’s insured not otherwise excluded.
xi. Service in any kind of armed forces (military, police, security services)
xii. Shipbuilding, ship repairing and shipbreaking
xiii. Ships crews
xiv. Subaqueous/Underwater works and laying of marine cables
xv. The construction, maintenance and demolition of towers, steeples, 
      bridges longer than 30 metres and chimney shaft unless merely incidental to the operations and / or trade of the company’s insured not otherwise excluded
xvi.Tunnelling exceeding 100 metres in length
xvii.Underground and underwater mines and all underground services in connection therewith CHAPTER I(d): UNDERWRITING GUIDELINE - 
NON-MOTOR - FOREIGN WORKERS COMPENSATION SCHEME
177


Sub Contractor Steals from General Contractor

Suspect Arrested On Construction Site

Rescue From Scaffolding Collapse

Suspended Scaffolding Safety Video and DVD






 Accident
Jury Hear Crane Accident - BBC UK
View
  Oct 10, 2009 3:36 AM Simon Poon
 CAR/EAR - Claim Assistance (承包所有风险/安装所有的风险 - 索赔援助)
2nd Principal_WorkmenCom_Claim Notification
View
2nd Principal_WorkmenCom_Claim Notification  Feb 10, 2012 7:08 PM Simon Poon
NoticeofClaim-Non-Motor.pdf
View Download
Contractor All Risk Insurance Claim (A) For material damage claim Completed claim form Police report Repair/replacement bill/quotation/delivery orders/stock records Contract documents, including bill of quantities and scope of work, letter of award Photographs of the damaged item(s) Consultant's or internal report on the cause and extent of damage A copy of Insured's NRIC (For individual) A copy of Insured's Business Registration (For company) Completed claim form Police report Repair/replacement bill/quotation/delivery orders/stock records Contract documents, including bill of quantities and scope of work, letter of award Photographs of the damaged item(s) Consultant's or internal report on the cause and extent of damage A copy of Insured's NRIC (For individual) A copy of Insured's Business Registration (For company) (B) For Third Party Liability claim Completed claim form Police report Incident report Repair bills/quotation for property damage claim Photographs of the damaged item(s) Consultant's report on the cause/ nature extent of damage Medical report / Death certificate / post mortem report (for Fatal & injury claim)  52k v. 3 Oct 23, 2011 11:04 AM Simon Poon
 CONSTRUCTION ACCIDENT STATISTICS (施工意外统计数字)
Contractor’s Liability As Occupier Of Premise To Trespasser In Safety At Work Cases
View
By Dr Rozanah Ab Rahman, Lecturer in Law, Faculty of Economics and Management, Universiti Putra Malaysia  Oct 23, 2011 10:59 AM Simon Poon
CRANE ACCIDENT STATISTICS
View
WORLD-WIDE TOWER CRANE ACCIDENT STATISTICS 2000 - 2009  (全球塔式起重机意外统计2000 - 2009)  Oct 23, 2011 10:59 AM Simon Poon
Fatal Accident by Sector of Industry in Malaysia
View
Kemalangan Pekerjaan Mengikut Sektor Bagi Kategori THUK Tahun 2008 ( Disiasat )  Oct 23, 2011 10:59 AM Simon Poon
Kemalangan Pekerjaan Mengikut Sektor Bagi HUK Sehingga Oktober 2008 (Disiasat)
View
Occupation accident base on sector for categories causing Permanent Disabilty until October 2008 ( Investigated )   Oct 23, 2011 10:59 AM Simon Poon
 Survey (调查)
Dilapidation Survey For Contractor
View
  Oct 23, 2011 10:55 AM Simon Poon
 Z - Customer Report - Repot Pemegang Polisi - 客户报告
20110809FROM20110720_NEOGENBULIDERSSDNBHD_DEOLANDGILLASPRINCIPAL_CAR_RM51,103_LONPAC_POLICY_W11EC00016167KUL-02.pdf
View Download
2011 08 09 FROM 2011 07 20_NEOGEN BULIDERS SDN BHD_DEOL AND GILL AS PRINCIPAL_CAR_RM51,103_LONPAC_POLICY_W 11 EC00 016167 KUL -02  278k v. 4 Oct 23, 2011 10:56 AM Simon Poon
2012 01 24 from 2011 12 07_FUSION BESIGN SDN BHD_Renovation Works for a Syrian Restaurant of Concorde Hotel_CAR_SI RM636000_LONPAC C NOTE_0419118.pdf
View
2012 01 24 from 2011 12 07_FUSION BESIGN SDN BHD_Renovation Works for a Syrian Restaurant of Concorde Hotel_CAR_SI RM636000_LONPAC C NOTE_0419118.pdf  Dec 7, 2011 4:32 AM Simon Poon
2012 01 24 from 2011 12 07_FUSION BESIGN SDN BHD_Renovation Works for a Syrian Restaurant of Concorde Hotel_CAR_SI RM636000_LONPAC_POLICY_W-11-EC00-016829-KUL·01
View
FUSION BESIGN SDN BHD_Renovation Works for a Syrian Restaurant of Concorde Hotel_CAR_SI RM636000_LONPAC_POLICY_W-11-EC00-016829-KUL·01  Jan 3, 2012 1:33 AM Simon Poon
2012 01 24 from 2011 12 07_FUSION BESIGN SDN BHD_Renovation Works for a Syrian Restaurant of Concorde Hotel_WORKMEN COMP_SI RM20,400_LONPAC_POLICY_W-11-WC00-019815-KUL-22
View
FUSION BESIGN SDN BHD_Renovation Works for a Syrian Restaurant of Concorde Hotel_WORKMEN COMP_SI RM20,400_LONPAC_POLICY_W-11-WC00-019815-KUL-22  Jan 3, 2012 1:33 AM Simon Poon
20120126FROM20110805_NEOGENBUILDERSSDNBHD_EDWARDLIMANDLSDEVELOPMENTSDNBHD_CAR_RM261,196_LONPAC_W11EC0001159KUL-02.pdf
View Download
2012 01 26 FROM 2011 08 05_NEOGEN BUILDERS SDN BHD_EDWARD LIM AND LS DEVELOPMENT SDN BHD_CAR_RM261,196_LONPAC_W 11 EC00 01159 KUL-02  276k v. 3 Oct 23, 2011 10:56 AM Simon Poon
2012 03 20 from 2012 02 21_TRINITY CONCEPT BUILDERS SDN BHD_529418-T_HP ResellerOutletRefurbishment_CAR WORKMEN COMP_LONPAC C NOTE_0427508_0427509
View
2012 03 20 from 2012 02 21_TRINITY CONCEPT BUILDERS SDN BHD_529418-T_HP ResellerOutletRefurbishment_CAR WORKMEN COMP_LONPAC C NOTE_0427508_0427509  Feb 16, 2012 10:13 AM Simon Poon
2012 04 03 from 2012 01 04_AVISTARZ PTE LTD AS CONTRACTOR AND PARK ROYAL KL AS PRINCIPAL_CAR AND WORKMEN_LONPAC_C NOTE_0427503_042750
View
AVISTARZ PTE LTD AS CONTRACTOR AND PARK ROYAL KL AS PRINCIPAL_CAR AND WORKMEN_LONPAC_C NOTE_0427503_0427504  Jan 3, 2012 8:54 PM Simon Poon
20120403from20120104_AVISTARZPTELTDASCONTRACTORANDPARKROYALKLASPRINCIPAL_CARANDWORKMEN_LONPAC_CNOTE_0427503_0427502.pdf
View Download
2012 04 03 from 2012 01 04_AVISTARZ PTE LTD AS CONTRACTOR AND PARK ROYAL KL AS PRINCIPAL_CAR AND WORKMEN_LONPAC_C NOTE_0427503_0427502  970k v. 2 Jan 5, 2012 10:20 PM Simon Poon
2013 01 07 from 2012 01 08_ENERGY WORKFORCE ENG. M SDN BHD_838121V_PETRONAS PENAPISAN TERENGGANU_CGL_SI 250K__LONPAC COVER NOTE_0427506.pdf
View
ENERGY WORKFORCE ENG. M SDN BHD_838121V_PETRONAS PENAPISAN TERENGGANU_CGL_SI 250K__LONPAC COVER NOTE_0427506  Feb 2, 2012 12:18 PM Simon Poon
2014 01 07 from 2012 01 08_ENERGY WORKFORCE ENG. M SDN BHD_838121V_PETRONAS PENAPISAN TERENGGANU_CAR_SI 300K_LONPAC COVER NOTE_0427505
View
2014 01 07 from 2012 01 08_ENERGY WORKFORCE ENG. M SDN BHD_838121V_PETRONAS PENAPISAN TERENGGANU_CAR_SI 300K_LONPAC COVER NOTE_0427505  Feb 2, 2012 12:18 PM Simon Poon
2014 01 07 from 2012 01 08_ENERGY WORKFORCE ENG. M SDN BHD_838121V_PETRONAS PENAPISAN TERENGGANU_WORKMEN_SI 30K_COM LIAB_200K_LONPAC COVER NOTE_0427507.
View
ENERGY WORKFORCE ENG. M SDN BHD_838121V_PETRONAS PENAPISAN TERENGGANU_WORKMEN_SI 30K_COM LIAB_200K_LONPAC COVER NOTE_0427507.  Feb 2, 2012 12:18 PM Simon Poon

ING Start Living

SPA Condo Risk

Allianz Auto Insurance


Tailor Suite Your Financial Security Need

Site owners

  • Simon Poon